Skip to main contentSkip to page footer

Walldorf
Project

New timber-hybrid administration building

About the project

A wood-hybrid building is planned for the Walldorf site. For its initial occupancy by a single tenant, the administrative building will be equipped with modern office spaces, a kitchen, and a rooftop terrace. However, the building is designed to be flexible and accommodate multiple tenants.

Green Building

The building is designed to be carbon-neutral throughout its entire lifecycle, not just during operation. Heating is provided by a combination of geothermal heat pumps and air-source heat pumps. Cooling is achieved through direct cooling from the geothermal field and additional evaporative cooling. The additional rooftop and facade photovoltaic systems ensure CO2-positive operation to reduce the “carbon footprint.” To minimize energy consumption, the entire building is controlled on a zone-by-zone basis, tailored to specific needs. The building is to be certified as “Climate Positive” by the DGNB.

Planning phase:
2021–2023

Location:
Walldorf

Client:
Becken Development GmbH

Project management:
Dreyer & Kollegen Real Estate GmbH

Architect:
StructureLab GmbH, Düsseldorf

Gross floor area:
5,430 m²

Scope of work:
HOAI §53, LPH 1–7,
AGR 1–8

Certification:
DGNB Platinum planned

Visualization: Architecture by StructureLab