Home>Projects>Industry . Production

Industry . Production

ROBERT BOSCH GMBH/BOSCH REXROTH AG, ULM-ELCHINGEN, NEW ADMINISTRATION BUILDING FOR THE DEVELOPMENT CENTRE

Scope of supply
Planning the technical supply installations in the administration building for the trades/systems sanitation and heating with 6 heat pumps of 150 kW each (waste heat from cooling water from motor test stands), air-conditioning, ventilation of the canteen kitchen, ca. 1 MW cooling power,and Klein-Kälte for cold-storage rooms. The canteen kitchen has a capacity of approx 1,200 meals/day for 850 people and operates on two shifts.

Planning and site management for refurbishment of the technical supply installations covering the trades/systems sanitation, heating, ventilation, media, rainwater drainage in  Buildings Ec115 - Ec120, and refurbishment and new installation of sprinklers in Buildings Ec109 – Ec120 (including a new sprinkler control centre).

Planning and site management for refurbishment of the ventilation and air-conditioning systems, including cooling and I&C in Building Ec109.

Illustration: © Robert Bosch GmbH, Ulm-Elchingen

Location
Ulm-Elchingen

Client
Robert Bosch GmbH

Realisation period
2007 - 2009

Area
7,300 m² gross floor area

Service phases
HOAI § 73, Phases 1 - 8 

back