ROBERT BOSCH GMBH, WAIBLINGEN, PLANNING AND SITE MANAGEMENT FOR SEVERAL PROJECTS

Scope of supply
Energy potential analysis for the trades/systems heating and ventilation, and determining the cost of refurbishing the entire works

Planning for refurbishment of the heating plant and comparing the 1.2 MW part-load boiler, a CHP block and heat-recuperation from compressed air

Refurbishment of building Wa103b covering the installation of a sprinkler system for the entire works, including refurbishing the drinking-water supply and installing hydrant pipelines while the buildings remained in operation, refurbishment of ventilation plant in Wa103a kitchen, canteen and locker rooms, taking into account the VStättVO requirements for 600 persons.

Preparation of a heating energy concept for the entire works with CHP block technology and heat-recovery systems, including process equipment and planning the complete 5 MW heating installation.

Illustration: @ Pressebilder Robert Bosch GmbH

Location
Waiblingen

Client
Robert Bosch GmbH, Waiblingen

Realisation period
2011 - 2016

Service phases
HOAI § 53, Phases 1 - 8