Skip to main contentSkip to page footer

Project
: Münster University of Applied Sciences, Steinfurt Campus

New construction of Building C, Building Q and the multi-storey car park

About the project

As part of the sustainable development of the Steinfurt Technology Campus at Münster University of Applied Sciences, new laboratory, department and teaching buildings are being constructed as part of a long-term masterplan to modernise the university site. The new buildings will be shared by various academic departments and will provide modern spaces for research, teaching and administration.

The building services are consistently geared towards energy efficiency, sustainability and the long-term climate-neutral operation of the campus. Key components of the energy concept include geothermal heat pumps for heating and cooling, photovoltaic systems on the rooftops, a central energy infrastructure and smart supply systems for the future integration of further campus buildings.

Key aspects of the building services engineering include the design and integration of heating, cooling, ventilation, plumbing and building automation systems for laboratory, teaching and office areas. The concept is complemented by measures for rainwater harvesting, green roofs, e-mobility infrastructure and a future-proof energy supply for the entire campus. The campus development is one of the most significant higher education construction projects in North Rhine-Westphalia and sets new standards for sustainable university infrastructure and innovative building services engineering.

Client
Bau- und Liegenschaftsbetrieb NRW, Niederlassung Münster

Location:
Steinfurt 

Architect:
Behnisch Architekten, Stuttgart

 

Project Data
Area: Building Q 2.233 m², 
Building C 11.817 m²   

Scope of work: HOAI § 53, Phases 1 – 9 | AGR 1 - 3, 7 - 8

Planning phase: 2024–2027

Construction phase: 2025–2028 

Images: © Behnisch Architekten, Stuttgart