AOK – VARIOUS REFURBISHMENT AND NEW CONSTRUCTION PROJECTS

Scope of services

1) AOK Freiburg
Refurbishment of ventilation and heating centre

Planning and site management for the full refurbishment of three air conditioning systems and the heating system during ongoing operation, and retrofitting a centralised cooling supply system at the AOK’s headquarters.

  • GFA:  approx. 4,000 m²
  • Service phases: HOAI Section 53, Phases 1-8

Redesigning the customer centre
Planning and site management for a complete redesign of the customer centre, involving all of the technical supply systems for heating, ventilation, media technology, electrical engineering and lighting.

  • GFA: 800 m²
  • Service phases: HOAI Section 53, Phases 1-8 

Refurbishment of the first floor conference rooms
Planning and site management for a refurbishment of the conference rooms: heating, ventilation, media technology, electrical engineering and lighting

  • GFA: 300 m²
  • Service phases: HOAI Section 53, Phases 1-8

2) AOK Villingen-Schwenningen
Various refurbishment projects in the building, including planning and site management for a complete upgrade of the full air-conditioning system and fire dampers (60,000 m³/h volumetric flow rate); conversion done during ongoing operation. Full refurbishment of the boiler system (735 kW heating output) and cooling system (328 kW cooling capacity). Refurbishment of all of the electrical engineering, including ICE and the building management system. Refurbishment and expansion of office and training premises, call centre and IT area.

  • GFA: 7,340 m²
  • Service phases: HOAI Section 73, Phases 1-9



3) AOK Lörrach
Planning and site management for refurbishing all of the electrical installations (IT, fire alarm system, lighting) in the administration building.

  • GFA: 4,200 m²
  • Service phases: HOAI Section 73, Phases 1-9

4) AOK Lahr
Refurbishment of ventilation and air-conditioning equipment, and lighting
Planning and site management for refurbishing the ventilation and cooling system and the lighting systems.

  • Service phases: HOAI Section 53, Phases 1-8

5) AOK Schramberg
Fire alarm system throughout; fire protection upgrade

  • Service phases: HOAI Section 53, Phases 1-8

6) AOK Emmendingen
Full refurbishment and extension of customer centre
Planning and site management for the full refurbishment of the existing building and an extension of the customer centre. Refurbishing a 190 kW boiler system and two ventilation and air conditioning systems (16,000 m³) as well as the plumbing, cooling and ICE systems.

  • GFA: 2,900 m²
  • Service phases: HOAI Section 53, Phases 1-8

7) AOK Waldshut Neubau
Planning and site management for all of the technical supply systems: plumbing, heating, ventilation, cooling, electrical engineering, sprinklers and ICE.

  • GFA: 6,200 m²
  • Service phases: HOAI Section 53, Phases 1-8

Planning/realisation phase
2007 - 2019

Client
AOK Baden-Württemberg

 

Town or city