Project
Walldorf

New construction of a wood-hybrid office building

The project
A wood hybrid building is planned at the Walldorf location. The office building is to be designed for a tenant's first use with modern office space, a kitchen and roof terrace. Still, the building is flexibly prepared as a multi-tenant.

Green Building
A CO2-neutral building is planned, over the life cycle and not only during operation. Heating is provided by a combination of geothermal heat pumps and air heat pumps. Cooling is realised via direct cooling from the geothermal field and additional cooling by air evaporation. The additional roof and facade photovoltaic systems ensure CO2-positive operation in order to reduce the "CO2 backpack". To minimise energy expenses, the entire building is completely demand-responsive and individually controlled on a zone-by-zone basis. The building is to be DGNB "climate positive" certified.

Planning phase
2021 - 2023

Town or city
Walldorf

Client
Becken Development GmbH

Project management
Dreyer & Kollegen Real Estate GmbH

Architect
StructureLab GmbH, Düsseldorf

GFA
5.430 m²  

Service phases
HOAI Section 53, Phases 1 - 7
AGR 1 - 8

Certification
DGNB Platin planned

Visualisation: Achitecture by StructureLab